Window ledge with drip feature

When finishing off doors and windows maximum care must be taken with joints between coverings and the material bordering the opening, where thermal bridges can transpire and thermal expansion can cause cracks.

A. Insulation panel
B. Fireproof safety panel
C. Strip of seal

* Consider leaving at least 1.5 cm between the cover with drip feature and the covered wall.

LINK TO THE TECHNICAL MANUAL

Did you like this Technical Flash?
Share this

Can we help you? Call the number +39 0365331411 or  fill out the form

loader